Owner

Hilton

Duration

March 10, 2026 – May 15, 2026

Services

Asphalt Paving & Repair, Excavation

Project Overview

The Hilton Vacation Club at Branson Cedars needed a way to connect two areas of the resort without sending guests and staff out of their way onto Highway 86. Springfield Striping & Sealing took on the challenge with a full paving and sitework scope.

The team built a new on-property roadway linking the two existing areas, handling extensive excavation and earthwork to prepare the route. Drainage improvements and a large culvert installation kept the new road protected from water buildup. Springfield Striping & Sealing then paved the roadway and installed over two miles of new and improved asphalt golf cart paths throughout the resort.

Hilton Vacation Club got a safer, more connected property, allowing guests and staff to travel directly between areas of the resort without crossing a highway.

Project Highlights

  • Built a new on-property roadway connecting two areas of the resort.
  • Eliminated the need for guests and staff to cross Highway 86 between areas.
  • Completed extensive excavation and earthwork to prepare the route.
  • Installed drainage improvements and large culverts to protect the new road.
  • Paved the new roadway and installed more than two miles of golf cart paths.